Por favor, use este identificador para citar o enlazar este ítem: https://hdl.handle.net/20.500.12394/14239
Título: Productivity improvement by means of method engineering tools and automation in ice cream production at bonanza company
Autor(es): Menendez Elguera, Edgar Walter
Aldana Fernández, Sofia Raymunda
Torres Sanchez, Sebastian David
Arzapalo Bello, Rubén Darío
Asesor: Arzapalo Bello, Rubén Darío
Palabras clave: Ingeniería de métodos
Productividad industrial
Automatización industrial
Editorial: Universidad Continental
Fecha de publicación: 2023
Fecha disponible: 13-mar-2024
Cita bibliográfica: Menendez, E., Aldana, S., Torres, S. y Arzapalo, R. (2023). Productivity improvement by means of method engineering tools and automation in ice cream production at bonanza company. Tesis para optar el título profesional de Ingeniero Industrial, Escuela Académico Profesional de Ingeniería Industrial, Universidad Continental, Huancayo, Perú.
DOI: https://doi.org/10.1109/AIIoT58121.2023.10174439
Resumen/Abstract: The production of ice cream has become very popular in the last decade, showing a gradual increase in food consumption preference, generating millions of dollars in the international market, becoming a sector with great technological progress helping to improve the ice cream industry. Even so, there are companies that carry out the processes in an artisanal manner or with little technological modernization, as in the case of Bonanza. The objective of this article is to improve productivity through the use of method engineering tools and industrial automation in the production of the ice cream line of the Bonanza company. In a guided inspection, the operations diagram, process analysis and route diagram were determined. Finding dead times, bottlenecks, congestion and misuse of resources. With the help of Autodesk Inventor, Labview and TinkerCAD programs, the design and simulation of automated machines for the process of cleaning, inspection and weighing of fruit was carried out. This allowed to go from 30 min, 41 min and 65 min to 14 min and 20 minutes by merging the last two processes respectively. In addition to improving all internal processes and restructuring the path of the route. In conclusion, with the implementation of this project, the product execution time was reduced by 3 hours, optimal resources and increased productivity in the Bonanza company.
Incluido en: https://ieeexplore.ieee.org/document/10174439
Extensión: [13] páginas
Acceso: Acceso abierto
Fuente: Universidad Continental
Repositorio Institucional - Continental
Aparece en las colecciones: Tesis

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
IV_FIN_108_TE_Arzapalo_Aldana_Menendez_Torres_2023.pdfMenendez Elguera, Edgar Walter; Aldana Fernández, Sofia Raymunda; Torres Sanchez, Sebastian David; Arzapalo Bello, Rubén Darío1.97 MBAdobe PDF
Visualizar/Abrir
IV_FIN_108_Autorización_2023.pdf
  Restricted Access
Autorización254.61 kBAdobe PDFVisualizar/Abrir  Request a copy
Informe_Turnitin.pdf
  Restricted Access
Informe de Turnitin2.6 MBAdobe PDFVisualizar/Abrir  Request a copy


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons