Bitte benutzen Sie diese Kennung, um auf die Ressource zu verweisen: https://hdl.handle.net/20.500.12394/14748
Titel: Use of BIM Technology For Augmented Reality In Buildings
Autor(en): Pacheco Mercado, Aracely Marilu
Cerron Mercado, Cynthia Janeth
Tapara Giron, Fernando Reymundo
Herrera Parraguez, Augusto Alberto
metadata.dc.contributor.advisor: Herrera Parraguez, Augusto Alberto
Stichwörter: Realidad aumentada
Revit
Software de aplicación
Modelado de información de construcción
Herausgeber: Universidad Continental
Erscheinungsdatum: 2024
metadata.dc.date.available: 3-Jun-2024
Zitierform: Pacheco, A., Cerron, C., Tapara, F. y Herrera, A. (2024). Use of BIM Technology For Augmented Reality In Buildings. Tesis para optar el título profesional de Arquitecto, Escuela Académico Profesional de Arquitectura, Universidad Continental, Huancayo, Perú
metadata.dc.identifier.doi: https://doi.org/10.1109/CCWC60891.2024.10427955
Zusammenfassung: he study was conducted in the city of Huancayo, Junín, Peru. Between 2022 and 2023. It is based on the use of BIM technology (Building Information Modeling, referring to the modelling of buildings with parametric information), the model developed was made on a 200m2 plot, on three floors, modelled with Revit software, including the specialities of architecture, structures, sanitary and electrical installations. The model is relatively small in order to experiment its characteristics with Augmented Reality (AR) technology and to serve for learning and teaching. Subsequently, in the process of quality control of the model, the AUGIN software was used, which is a program that allows to reflect virtual reality (VR) in a physical space with augmented reality (AR) at 1:1 scale. Before the advent of VR and AR, plans and projects are still presented in 2D, with software such as AutoCAD and printed plans on paper. The research used the immersive, participatory and collaborative method to develop BIM modelling. The experimental project was validated through the tool "Focus Group"with people involved in the construction sector, which were selected randomly, on the other hand, the work was complemented with the use of software; ArcGIS for the location and location of the land and obtain a simulation fairly close to reality that has allowed to obtain relevant results and conclusions, which are shared in the document.
metadata.dc.relation: https://d82m.short.gy/t1maV6
Extension: p. 646-655
metadata.dc.rights.accessRights: Acceso restringido
metadata.dc.source: Universidad Continental
Repositorio Institucional - Continental
Enthalten in den Sammlungen:Tesis

Dateien zu dieser Ressource:
Datei Beschreibung GrößeFormat 
IV_FIN_106_TE_Pacheco_Cerron_Tapara_Herrera_2024.pdfResumen598.41 kBAdobe PDF
Öffnen/Anzeigen
IV_FIN_106_Autorización_2024.pdf
  Restricted Access
Autorización445.05 kBAdobe PDFÖffnen/Anzeigen Eine Dokumentkopie anfordern
Informe_Turnitin.pdf
  Restricted Access
Informe de Turnitin6.57 MBAdobe PDFÖffnen/Anzeigen Eine Dokumentkopie anfordern


Alle Ressourcen in diesem Repository sind urheberrechtlich geschützt, soweit nicht anderweitig angezeigt.