Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.12394/15035
Title: Implementation of an Alarm System to Protect a Submersible Pump of a Company in Cusco, 2023
Authors: Atapaucar Merma, José Luis
Espinoza Ríos, Elena Sonia Paula
Romani Quiliche, Carlos Arcenio
metadata.dc.contributor.advisor: Espinoza Ríos, Elena Sonia Paula
Keywords: Control
Automatización industrial
Controladores programables
Publisher: Universidad Continental
Issue Date: 2024
metadata.dc.date.available: 10-Jul-2024
Citation: Atapaucar, J., Espinoza, E. y Romani, C. (2024). Implementation of an Alarm System to Protect a Submersible Pump of a Company in Cusco, 2023. Tesis para optar el título profesional de Ingeniero Empresarial, Escuela Académico Profesional de Ingeniería Empresarial, Universidad Continental, Cusco, Perú.
metadata.dc.identifier.doi: https://doi.org/10.1145/3638264.3638274
Abstract: The implementation of an alarm system was carried out to pro- tect a submersible pump whose purpose is to maintain the river water supply of a company in Cusco. The guidelines of the PM- BOK, which is the main book of the PMI, were used. Within the development of the project, there are 5 phases: initiation, planning, execution, monitoring-control, and finally, closure. In the initial phase, interested parties will be determined, and the project char- ter will be drafted. In the planning phase, requirements gathering, design, analysis, risk management, and project schedule will be carried out. The execution phase will be carried out within the agreement with the interested parties, where the implementation of the project itself will be developed under the supervision of the project director. Progress in the monitoring and control phase will be monitored and controlled according to the schedule. Finally, in the Closing phase, what was requested by the interested parties can be compared with the final results. According to the results obtained in the initiation and planning phase, it is evident that there will be better remote control and monitoring of the submersible pump alarm system, minimizing unexpected stops. Therefore, it is concluded that by using Logo Soft Comfort tools such as Logo Web Editor and Logo Access Tool, monitoring and control screens can be developed and alarm reports generated to make assertive decisions, either for preventive or corrective maintenance of equipment, thus minimizing unwanted events that could affect the water supply from the river to the plant.
metadata.dc.relation: https://dl.acm.org/doi/10.1145/3638264.3638274
Extension: 7 páginas
metadata.dc.rights.accessRights: Acceso restringido
metadata.dc.source: Universidad Continental
Repositorio Institucional - Continental
Appears in Collections:Tesis

Files in This Item:
File Description SizeFormat 
IV_FIN_114_TE_Romani_Atapaucar_Espinoza_2024.pdfRomani Quiliche, Carlos Arcenio; Atapaucar Merma, José Luis; Espinoza Ríos, Elena Sonia Paula663.98 kBAdobe PDF
View/Open
IV_FIN_114_Autorización_2024.pdf
  Restricted Access
Autorización164.11 kBAdobe PDFView/Open Request a copy
Informe_Turnitin.pdf
  Restricted Access
Informe de Turnitin1.86 MBAdobe PDFView/Open Request a copy


This item is licensed under a Creative Commons License Creative Commons