Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.12394/15387
Full metadata record
DC FieldValueLanguage
dc.contributor.advisorBayona Carazas, Guillermo Anibales_PE
dc.contributor.authorCarrion Miguel, Pamela Stefanyes_PE
dc.contributor.authorInocente Hurtado, Stefanny Pamelaes_PE
dc.contributor.authorRojas Benito, Renzo Andreees_PE
dc.contributor.authorBayona Carazas, Guillermo Anibales_PE
dc.date.accessioned2024-09-05T22:21:42Z-
dc.date.available2024-09-05T22:21:42Z-
dc.date.issued2024-
dc.identifier.citationCarrion, P., Inocente, S., Rojas, R. y Bayona, G. (2024). Optimization of the Stacking Process of Wire Mesh Coils in Industrial Processors. Tesis para optar el título profesional de Ingeniero Industrial, Escuela Académico Profesional de Ingeniería Industrial, Universidad Continental, Huancayo, Perú.es_PE
dc.identifier.urihttps://hdl.handle.net/20.500.12394/15387-
dc.description.abstractThis study proposes to optimise the post-production and storage process of electro-welded mesh rolls in companies in the city of Lima, for which this study has taken into account the entire production line and production of electro-welded mesh up to its storage, where the bottlenecks encountered occur when the final product is removed from the production line and taken to the warehouse. The forklift operator has to come constantly from time to time to lift the rolls two by two onto a rack and then take them to the warehouse with a total of 15 rolls, and this process is repeated every day. In the warehouse, the rolls are stacked two by two, all of which takes time and delays productivity. That is why the aim of this study is to analyse production, post-production and storage and to optimise to improve time, production and resource management. All this is achieved by using mathematical calculations, analysis software and finally an automatic machine is proposed, so that when the roll comes out of the winding machine, it is automatically stacked in the rack, once the 15 rolls are stacked, the conveyor belt moves the entire rack and only the forklift moves to the warehouse, being more productive since the racks will also be stackable. The results obtained in the analysis show that by implementing an automatic post-production and storage machine, the transfer and stacking times decrease significantly up to 76.76 % and the operational efficiency of the machine improves up to 79.35%, which benefits greatly and in the long term the entire production of this industrial line.es_PE
dc.formatapplication/pdfes_PE
dc.format.extent[3] páginases_PE
dc.language.isoenges_PE
dc.publisherUniversidad Continentales_PE
dc.relation.urihttps://link.springer.com/chapter/10.1007/978-3-031-56373-7_9es_PE
dc.rightsinfo:eu-repo/semantics/restrictedAccesses_PE
dc.sourceUniversidad Continentales_PE
dc.sourceRepositorio Institucional - Continentales_PE
dc.subjectElectrosoldaduraes_PE
dc.subjectMáquinaes_PE
dc.titleOptimization of the Stacking Process of Wire Mesh Coils in Industrial Processorses_PE
dc.typeinfo:eu-repo/semantics/bachelorThesises_PE
dc.rights.accessRightsAcceso restringidoes_PE
dc.publisher.countryPEes_PE
thesis.degree.nameIngeniero Industriales_PE
thesis.degree.grantorUniversidad Continental. Facultad de Ingeniería.es_PE
thesis.degree.disciplineIngeniería Industriales_PE
thesis.degree.programPregrado presencial regulares_PE
dc.identifier.journalIndustrial Engineering and Industrial Managementes_PE
dc.identifier.doihttps://doi.org/10.1007/978-3-031-56373-7_9-
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.11.04es_PE
renati.advisor.dni07474656-
renati.advisor.orcidhttps://orcid.org/0000-0001-6817-2085es_PE
renati.author.dni74074875-
renati.author.dni71231462-
renati.author.dni73474228-
renati.author.dni07474656-
renati.discipline722026es_PE
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales_PE
renati.typehttps://purl.org/pe-repo/renati/type#tesises_PE
dc.type.versioninfo:eu-repo/semantics/publishedVersiones_PE
Appears in Collections:Tesis

Files in This Item:
File Description SizeFormat 
IV_FIN_108_TE_Carrion_Inocente_Rojas_Bayona_2024.pdfResumen581.14 kBAdobe PDF
View/Open
IV_FIN_108_Autorización_2024.pdf
  Restricted Access
Autorización109.91 kBAdobe PDFView/Open Request a copy
Informe_Turnitin.pdf
  Restricted Access
Informe de Turnitin1.84 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.